You are currently viewing Day 26: Production Ready Intake

Day 26: Production Ready Intake

This is our intake ready for drawing to be made and sent off for production. This model doesn’t show the intake rollers that go over the tube axles or the belts that drive the rollers. The intake is so large because we are using it to store the ball as well. That way we don’t take up space in our robot, the ball is fed from the intake to the shooter only once we are ready to fire the ball. The first roller will be spinning far faster than the rear two that are design to control the ball and get it ready for the shooter.
– Spectrum
“Leadership and learning are indispensable to each other.” ― John F. Kennedy