We are almost finished with our drive train draft CAD. We have started turning parts on the lathe to get ready for assembly. We will be cutting out the drive train on our router to make sure everything works.
We installed VEX versaplanetary shaft encoders on our shooter and we will be able to get some good testing done over the weekend.
Tomorrow we have our 2nd design review to update the entire team about the status of the design .
– Spectrum
“If you don’t see yourself as a winner, then you cannot perform as a winner.” – Zig Ziglar